Grace Christian Church Project List

 

Please note all projects are to be pre-approved by the pastors before starting.

 

OUTSIDE

 

 

 

North

 

1.      

                 Paint roof face trim.

 

2.       Paint all window trim.

 

3.       Check roof flashing & seal.

 

4.       Reseal front double door.

 

5.       Photocell control for door lights.

 

6.       Take up carpet on front step & paint (with non skid paint).

 

 

East

1.      

                 Paint all window trim.

 

2.       Paint roof face trim.

 

3.       Paint vent board basement window north of step.

 

4.       Photocell door light.

 

5.       Replace broken windows.

 

6.       Remove tar graffiti.

 

 

 

South

 

1.      

                Paint all window trim.

 

2.       Paint roof face trim.

 

3.       Replace broken window.

 

4.       Repair or replace flat roof with pitch roof.

 

 

 

 

West

 

  Take down smoke stack.

 

2.       Paint all window trim.

 

3.       Paint roof face trim.

 

4.       Replace broken window.

 

       Cover condensate & power line for 2nd floor A/C

 

5.       Cover vent above top window.

 

7.        New yard lights & control.

 

8.           New sign light & control.

 

9.          Repair parking lot flood lights (3).

 

10.  Repair concrete ramp where damaged.

 

11.      Install door light photocell.

 

 

MAJOR PROJECTS

 

 There are two areas that directly affect the indoor area;

 

1.       North door entrance, old daycare door.

 

2.       Southeast sidewalk south of the State St. door entrance.

 

 

Both areas have severe water damage due to the build up of water.

These areas must be dealt with to repair the inside damage.

 

SPECIAL PROJECT

Furnace Filter Brackets

 

 

INSIDE

 

 

 

 

 

 

 

 

 

INSIDE

 

3.        

               Once water areas are fixed, repair ceiling in #1 & repair lights.

 

4.         Replace carpet in basement music room.

 

5.      Paint sanctuary. (Finished)

 

6.       Repair or replace baptism.

       

       Rewire the youth area upstairs.

      

       New offering boxes in sanctuary.  (Finished)

 

7.       Repair Electrical panel at coffee machine. (Finished)

 

8.       Add lights & counter for coffee machine (safety). (Finished)

 

10.   Add Data & cable for upstairs youth area. (Finished)

 

 

 

 

 

 

BASEMENT

Priority Item

Priority Item

Priority Item

 

 

Priority Item

 

  South hallway to south door, install ramp.

  South hallway to fellowship hall, replace 8’ lights with new lights.

  Dungeon needs lights at south end.

  Install tool cabinet in dungeon.

  Install parts cabinet in dungeon.

  Replace 3” drain by heater in dungeon.

  Paint men’s restroom. (Finished)

  Install new sink & cabinet in woman’s rest room. (Finished)

  Paint woman’s rest room. (Finished)

  Repair or replace linoleum in woman’s rest room. (Finished)

  Fellowship hall way possibly install ceiling.

  Paint the wall where the pop machine used to be in the basement. (Finished)

 

 

KITCHEN

 

  New electric service for stoves (2).

  New range hood, make one that covers both stoves.

 

 

Priority Item

1st FLOOR

 

 

  Pastors Office, replace ceiling tile, also on stage.

  East door hallway light, replace with new style.

  Paint stairway to youth area.

  Install new light for stairs to youth area.

 

 

2nd FLOOR

 

  

  Make new door for the rest room closet. (Finished)

 

Please see Brice Hayes or Stu Way for more information

regarding the projects available and what you can do to help out.

 

This report will be updated as information becomes available.      

 

                       “A happy giver is a cheerful giver.”

 

 

 
 

 

All rights reserved. Grace Christian Church - Kendallville. 2006. Privacy policy | Terms of use